Material Master - Mass Update - Locks

Hi All, i am not sure where exactly this belongs BASIS/ABAP but posting here from development perspective.


We are in the process of mass creating 65,000 material master records and extending them to plant and storage location views. We are not planning on to use LSMW or WinShuttle. From a development perspective, I do not like the approach of updating one material master at a time using (BAPI_MATERIAL_SAVE) as it might take a long time to update (over 8 days). So, we are looking at BAPI_MATERIAL_SAVEREPLICA (Update multiple material masters at one time) but are worried that it might cause locking issues since our locking size is limited to 200,000. Do you guys see or have any other options that we could give a try?

Thanks

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jan 13, 2016 at 01:42 PM

    Dear,

    Why can`t you split the qty and update one after other.

    Is their any constraints to use LSMW in your Org.?

    Regards,

    Pardhu

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.