CJV4 - SAP Message No. CN619 - Control Key Not Available For Costs

Good day,

Recently my parent company created new internal rates and assigned new Work Cntr's to these rates under the same Control Key (PS01). However when we do the budget planning of internal hours (ZHM) and upload these into the network and re-calculate costs and try and update the version we get an Error Message No.CN619.

The odd part is that the same Work Centers under that exact same control key updated 6 out of 7 projects perfectly fine. The error message is only produced under 1 project. I have deleted the activity and re-created it and as far as I can tell I have done absolutely nothing different in this project then in any of the others however the error is produced no mater what I do.

Any idea's? or do you require some additional information?

I am out of idea's

Thanks in advance

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Jan 13, 2016 at 04:19 AM

    Hi Dustin,

    Message shows that Control key for General Cost Activity is not valid.

    might be you have activated "Gen Cost Act" in PS01/PS02 etc.

    please check and confirm.

    thanks

    Sunil

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Sunil,

      Thanks for the reply.

      From what I can see there is no difference between the two projects when I get the detailed information for the Control Key.

      Again the same Work Center is being used in relation to the same Control Key on two separate projects, however CJV4 isnt working. This leads me to believe that it is something at the project level possibly in the network? or when the project was created.

  • Posted on Jan 14, 2016 at 06:30 PM

    Do all of the Network Activities on the different projects have the same plant? Workcenters are plant specific.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Ken Melching

      Ok,

      So I deleted all the new activities so all that remained were the old ones with had previous hours and costs booked and tried to create a version from those and the errors still persist.

      However this time in the details it says

      Method: Update

      Object Type: Network Activity

      Object:

      Where as before it always had an activity number from one of the ones associated to the new work centers in the Object: field

      So maybe this has nothing to do with the Work Center / Control Key relationship.

      Any other ideas on what it may be?

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.