Hello experts,

We have an issue with a process order 7000148145 which is already in confirmed status.

But the goods movement display of the process order does not show the 101 movement for the header material 2067. Please refer to the attached screenprint.

Can you please let us know the rootcause of the same.

Thanks and regards,

Kaushik

1_12.JPG (176.5 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 12, 2016 at 05:32 AM

    I think issue with the control key..

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 12, 2016 at 06:39 AM

    How many operations does this process order have? What are the operations you have already confirmed? Please share the screen of operations. If there are multiple operations please check the control keys of operations.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 12, 2016 at 09:27 AM

    Hi,

    Please check the Documented goods movement in Process order, where all the goods movement will be listed.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 12, 2016 at 09:51 AM

    Dear Kaushik,

    Your process order has CNF ORSP REL status (ORSP Open reservation Posted)

    there is no DLV or PDLV exist for the process order status..so 101 was not happened for the parent material

    So requesting you to check the control key whether auto GR enabled or not ??

    if not please activate with auto GR and assign the same control key in Process order operation overview

    then try to make the confirmation..

    system will post the goods receipt for parent also...

    if your parent is a Co-Product means you have to do the manual GR through MIGO

    Because standard SAP will not allow auto GR for Co-Products until you are using EHP7 Package with business function LOG_PP_CI_1

    Regards,

    Venkatesh..

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 13, 2016 at 09:03 AM

    Dear Kaushik basu,

    As Venkatesh says, the status of the Production Order should have either DLV or PDLV... But according to the attachment neither of the status is available in your Order.

    Do GR for production with MIGO and kindly check again.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 13, 2016 at 09:51 AM

    Hello,

    I think the issue is with control key or check the Control key assigned on last Phase/Operation in master recipe.If possible, share screenshots.

    You can also do manual GR with MB31 for header component/Co-Products.

    Regards,

    Amit Sharma

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.