SA GR Qty exceed scheduled qty

Dear expert,

I found some Schedule Agreement GR Qty have exceed scheduled qty, these SA have Kanban Indicator,

so, we do GR via T-code PJWE with JIT Calls. My question is that in the standard system is there a control point for this?

Thanks a lot in advance!

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Jan 12, 2016 at 07:39 AM

    Dear Sir,

    Please make 'E' of bothe message M7022 and M7024,just now I have checked it is perfectly working

    saikat


    Untitled.png (52.0 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 12, 2016 at 05:19 AM

    Dear Sir,

    Check/Activate message number M7--024 or/and M7 -248

    saikat

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 12, 2016 at 06:09 AM

    hi,

    Check tolerance limit maintained and document all movement, whether it has reversed but did not cleared. Then share your details.

    Regards

    Sanjeet

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.