Skip to Content

UMT Rollback/truncation of content

Promotion management has a great feature to rollback the migration - whats the best way to rollback or truncate the content after migration using PMT? plus is there a way to export the error /object log that failed during migration using UMT to excel or csv or anything?

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Jan 12, 2016 at 03:54 PM

    For the UMT, the relevant logs are already in csv format with a number of additional header rows. I usually open them in Excel, scroll down to the "table" part and filter based on the "Message Severity" column:

    0 = Success

    1 = Warning

    2 = Error

    It's important to note, though, that not all warnings or errors mean that the object was not moved to the new system.

    -Dell

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 08, 2016 at 01:48 AM

    If you have less content you can think of truncate, also rollback settings need to be enabled.

    check this out

    Using End to End trace for Promotion Management - Business Intelligence (BusinessObjects) - SCN Wiki

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.