in Plan scheduling through batch Job and IP30

Hi Team

There are batch jobs failure after long run for dead line monitoring .

With debugging we find out two maintenance plan at which system is moving in to infinite loop for these batch job. Same Maintenance plan has been removed from relevant variant of batch job, still facing the same issue.

Also tried to run IP30 manually for identified faulty maintenance plan and get run time error (time out error) after long run.

Any clue Please

Regards

Parth

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jan 06, 2016 at 11:36 AM

    The reason might lie with one or more maintenance plans. You need to try them one after one or in small groups (either in IP30 or in Background job) to identify those plans which are causing this situation.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.