Hi Expert

I am new to APO so not sure how this scenario would be. Can you help

Scenario: Businesses requirement is like to add new warehouse in APO and planning at warehouse level.Earlier we are doing only at production plant level but now want to at warehouse level.(6 warehouse)

what are processes include if I want to do Planning at warehouse

what are configuration step

Thanks in advance

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Dec 25, 2015 at 07:38 PM

    Mannu,

    Configuration would depend upon the current solution, and the detailed business requirements of the to-be solution.

    In addition, APO has several planning engines, each of which would require different answers.

    I suggest you consult with local experts to figure out exactly how the currently implemented solution works before you venture into creating additional functionalities (like planning at the warehouse level).  Or, if you wish to self-train, try reading the basics, found in sap online help:

    Supply Network Planning - SAP Library

    Production Planning and Detailed Scheduling (PP/DS) - SAP Library

    Capable-to-Match (CTM) - Multilevel Supply and Demand Matching (SDM) - SAP Library

    In addition, within Supply Network Planning, there are two major planning methods; Heuristic and Optimizer:

    Comparison of the Planning Methods - Supply Network Planning Run - SAP Library

    If you are unfamiliar with APO, and you have never done such an implementation, you would probably want to use experienced local solution architects for this project.  If such SAs don't exist, the common method used is to hire a consulting company with expertise in these subject areas.

    Best Regards,

    DB49

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Mannu,

      Re-asking the same question using different words will not change the answer.😢


      Configuration steps will depend on the business requirements, and on the solutions that have been chosen to satisfy these requirements.  Requirements and solutions will all be documented in the Business Blueprint for the project.  If you want to know the configuration steps, I suggest you study this document.

      Best Regards & Good Luck,

      DB49

  • avatar image
    Former Member
    Dec 26, 2015 at 11:01 AM

    HI DB49

    I have read document not getting what I was expected. why should u give me simple example

    let I have warehouse then I will create plant by type 1002 as distribution also i will assign resource to it like wise I need step to do plan at warehouse

    also planning engine i will be use as Heuristics.

    Hope u understand