Availibity date different from Order End date[SNP optimizer]

avinash_sharma
Active Participant
0 Kudos

Hi All,

I need help with understanding the date being calculated here by system. After planning, system created SNP Planned Order with Availability date and 04/07/2016, but the End date for the Planned Order is 30/06/2016.

What could be the possible entities that might be influencing this deference in dates.

Please see the attached screens.

Regards,

Avinash

Accepted Solutions (0)

Answers (2)

Answers (2)

nitin_thatte
Contributor
0 Kudos

Hi,

Apart from GR processing time; check the bucket offset setings in PDS/PPM or in optimizer profile.  If it is not equal to 1.0 (is close to 0) the availability date will be shown as next day.  If it is 1.0 it will show same availability date.

Nitin Thatte

ruchi_das2
Active Participant
0 Kudos

Hi Avinash,

Can you please check if you have a GR processing time maintained for this location-product. The difference between the start date and end date would be from the PDS for manufacture the product and the GR processing time is the lead time added to the end date to determine when the product is available.

Regards

AK