12-20-2015 3:57 PM
Hi Experts,
I have configured all the required settings of FM Budget Control on MM Reservations.
While creating Material Reservations, accurate Funds, Fund Centers and Commitment Items are getting derived but Budget Trigger is not working due to the fact that Earmarked Funds Document Number is not getting created:
I already have created Number Range (03) for Earmarked Funds and tried to create it manually through T-Code: FMX1 and its working.
I don't understand why document is not getting created if i have configured every required settings?
Kindly guide me where i am mistaken?
Regards,
Zain Bashir
12-21-2015 9:51 AM
12-21-2015 10:00 AM
Dear Zain,
You may find SAP Note 700485 (http://service.sap.com/sap/support/notes/700485) helpful to validate your Customizing!
Cheers,
Danilo
12-22-2015 5:34 AM
Hi Danilo,
Thanks for your input. It didn't worked.
Please refer screen shots of configurations for making Budget Control working on Material Reservations i have made, so far and guide me if you think i missed something:
1 - OFUP
2 - Funds Management specific Postings:
Please guide why still Material Reservation doesn't creating EMF Doc Number Ranges?
regards,
Zain Bashir
12-22-2015 12:20 PM
Hi Zain,
The next question would then be - which release are you on with regard to the EA-PS component. As far as I understand SAP Notes 1278967 (http://service.sap.com/sap/support/notes/1278967) and 1321375 (http://service.sap.com/sap/support/notes/1321375) the integration between Material Reservations and Funds Management is not available before 603 (EHP3) and then only, once you have activated the corresponding business function PSM_FM_CI_1 via the Switch Framework (TA SFW5).
You may want to check this as well!
Cheers,
Danilo
12-22-2015 12:57 PM
Hi Danilo,
The said Business Function is already activated, please refer screen shot:
Regards,
Zain Bashir
12-22-2015 1:39 PM
How about running executable program RFFMRP_MAT_RESERVATION for the material reservation that hasn't created the funds reservation?
12-22-2015 4:43 PM
Hi Danilo,
Thanks for the guide.
Its working after generating the said program but why system requires me to generate that program every time after creation of material reservations? why it is not getting generated automatically?
Please guide.
Regards,
Zain Bashir
12-23-2015 7:42 AM
12-23-2015 8:06 AM
Could you test the method CL_PSM_CORE_SWITCH_CHECK=>PSM_FM_CORE_GEN( ) within the affacted system? Call transaction SE24, Enter CL_PSM_CORE_SWITCH_CHECK as object type and press F8. From the list of methods click on the execution icon behind the method PSM_FM_CORE_GEN. Within the result screen the return parameter RV_ACTIVE should contain a vaule other than <SPACE>.
12-23-2015 11:25 AM
Hi Danilo,
Thanks for your reply.
Please refer the attached screen shot:
Please help
12-23-2015 12:00 PM
Hi Zain,
I'm afraid from here it requires to debug the system in order to find out whether the function module FM_MR_TO_FR_UPDATE is called when you create a material reservations using TA MB21. If you have a developer around ask him to set a breakpoint at the beginning of the form BELEG_BUCHEN with module pool SAPMM07R. Then he/she should try to create a material reservation and wait for the transaction to stop at the breakpoint - continue step by step. There are basically 2 things to watch out for...
Alternatively you may want to consider to open an incident with SAP SE describing that the funds reservations is working in batch (Program RFFMRP_MAT_RESERVATION) but not in real-time using TA MB21.
Cheers,
Danilo
12-30-2015 2:23 PM
Thanks Danilo,
I have achieved it by applying one User Exit EXIT SAPLFMDT_001.
Your posts were very helpful
07-19-2022 6:29 PM
Hello consultant, could you help me?
I have already configured the movement type 201 and BF is active according to the note 2042029 (How to implement Period wise Availability Control in BCS)
When the MB21 transaction is posting, does the system automatically create an FMX1 OR do I need to create the FMX1 and inform it (Earmarked Funds and item) on the MB21?
Regards
Claudio
07-21-2022 6:09 PM
Thanks!