Skip to Content
0
Dec 17, 2015 at 11:37 PM

passing the inspection results from component material to header mterial

22 Views

Hi Team,

I have one header material HD1 and material CMP1 is as component in process order. There is a common MIC lets say MIC1 in the inspection plan of both the material. CMP1 has been inspected and used in process order . Now we do the GR for header material HD1 to get another 04 lot.

Here I want inspection result of MIC1 to be passed from CMP1 to HD1 material. Is it possible to do this in standard SAP system ?

Thanks

Ravi Bhushan