Hi..

i have marking the one material i have used the ppc1 costing variant and releasing also done and also done the standard cost estimate success fully completed.when i was using the same plant but i have taken other material and different costing variant .when i was go to ck24 it will shown marking and released status it costing variant shown the ppc1 i have used different why the system default costing variant taken

Accepted Solutions (0)

Answers (7)

Answers (7)

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Kittu

For One controlling area you can only mark and release standard cost under one costing variant..but can use plant level valuation variant.

Kamal

former_member219500
Participant
0 Kudos

hi bhaskar

i will try i will update to you whethe it will woring or not

Thanks and regard

P.Ramakrishna

bhaskar_basam
Contributor
0 Kudos

you can maintain valuation varaint at plant level and assign to 1 single costing variant.

former_member219500
Participant
0 Kudos

but i am not maintain costing variant in plant level,where we maintain the costing variant at plant level

bhaskar_basam
Contributor
0 Kudos

System wont allow you to use different costing variant for the same plant once you released a price using a costing variant.

former_member219500
Participant
0 Kudos

No i am using the same plant but material is different and costing variant is different system will shown the default costing variant

bhaskar_basam
Contributor
0 Kudos

Hi Kittu

If both the plants are assigned in same company code, the system will allowed you to release with a single costing variant.

If your valuation strategy is different from your first plant, then create plant specific valuation variant by clicking on val var/plant on top and specify your strategy and assign your plant.

System will allow you to release with the same costing variant with different valuation strategy.

Regards

Bhaskar