Skip to Content
author's profile photo Former Member
Former Member

Livecache move from 2008R2(physical) to 2012R2(Vmware) help needed.

Hi All,

we are planning to move our Live cache stand alone database which is SAP MAX DB 7.9 from 2008R2 to 2012R2(Vmware) due to hardware license expiry.

Requesting to let me know which standard procedure do i have to follow?

More information of versions involved:

==========================

SCM 7.02

SAP MAXDB 7.9

Current procedure which we are planning to follow:


1)Matching resources in between source and target.

2)Installing SAP MAX DB software and SAP MAX DB studio in target a head.

3)Taking the full backup from source.

4)Restoring full backup into target which taken from source.

5)change the configuration items in LC10

6)Start Live cache.


Please let me know if we have any standard document to follow for this activity.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 17, 2015 at 08:33 AM

    Hi,

    yes this procedure should work for this platform combination.

    Regards, Christiane

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.