How to trace the actual system run date of APP and user details

Hi Team,

We have a requirement to trace the actual APP payment run date in the system. We tried in the PAYR table and we could trace with the print date. But not sure, if there is any other alternative way to trace the APP run date in the system. Below is the example of scenario.

Run Date: 01.01.2015

Identification: ABCD

Posting Date: 05.01.2015

Document Date: 05.01.2015

Here User will have the option to change the posting and document date. Appreciate any inputs on this to get a solution.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Dec 14, 2015 at 06:36 AM

    Hi Aj

    Check table REGUH / REGUP

    Regards

    Prasad

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 14, 2015 at 11:12 AM

    Hi AJ,

    You can check if the background job log for that payment run is still in the system. Look for *F110* jobs in SM37. You should be able to determine there when exactly did the APP ran.

    Hope this helps.

    Jayj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.