I am working on a architecture building issue in BPC 10.1 with NW 7.4.

I need to devise a strategy where i need to show Plan/Actual Data in Business objects (Design Studio / Webi / Crystal). Which is why i need to extract Planning data from the BPC to show the plan data with the actuals in BW.

To do this i have number of options:

  1. Make a Multi-Provider on top of BPC (PLAN) & BW (ACTUAL) Cube. (I have been told this method is not good because if full optimization is carried out on the BPC cube than the Multi Provider could be deactivated).
  2. Retraction of data to the self BW Server and then extraction of data via the traditions ETL process to BW Cube. ( Many people are following this method but still no one has given me a clear definition as to why they are using this method for loading data from bpc to bw cube.
  3. APD on top of BPC cube and then data loaded to classic DSO (A) via a write Optimizated DSO (B). From the DSO (A) data is pulled to the BW Cube. (this seems like a valid route to follow to me)
  4. Data Load from BPC Cube to the BW cube via transformation. (This has issues if the cube is fully optimized then the transformation and the dtp gets deactivated.)

Out of all these methods, which one would you recommend is the best based on BPC 10.1 on BW 7.4.

I need valid reasons.

Best Regards,

Shahzad Khero

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 10, 2015 at 11:16 PM

    Hi Shahzad,

    Use option 1, fix the cube names then you wont have the issue of changing technical names.

    option 1 will be the simplest way, as long the granularity is the same as the other BW cubes then rather go for option 1, option 2-4 creates extra data and loading time, unless transformation is required, else stick with option 1.

    Andy

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 10, 2015 at 04:48 PM

    if you turn on the 'use as source of data' option for the model you are looking at this should create a cube with _B at the end which should then be safe to use in options 1,3 & 4. I haven't tried this myself though so you should probably check first.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.