Skip to Content
author's profile photo Former Member
Former Member

How to use fm MPLAN_CHANGE

HI Gurus,

I am facing difficulty in using the FM mplan_change.

Getting the errors for some header fields even though I am not updating those fields.

Kindly guide me how to use this FM

Thanks in Advance.

Capture.PNG (21.1 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Dec 09, 2015 at 09:03 PM

    Hi Uma,

    Check this thread: https://scn.sap.com/thread/3659612

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.