Skip to Content

Error reading material ledger header record, Message no. C+ 065 While posting MIRO

Hi SAP Experts,

My client is using the material ledger functionality, recently while processing MIRO for a PO my client got an error "Error reading material ledger header record, Message no. C+ 065".

I asked my ABAPer to debug the issue and as per the technical team analysis while posting MIRO system is looking for cost estimation number(KALNR) 00000001(Hypothetical) where as in table CKMLHD system is getting value for Cost Estimation number(KALNR) as 0000002(Hypothetical).

I have checked some old posts where it is mentioned that the value of KALNR should be same in table MBEW and CKMLHD for a combination of material, Valuation type and Plant. In my case the value in MBEW is 000003(Hypothetical).

Now my concern is from where system is taking the cost estimation number value as 00000001. And if anyone already encounter such issue kindly provide me some insight how to resolve it.

Regards,

Amit

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Dec 05, 2015 at 06:16 AM

    You must be using split valuation with material ledger. Please have a look into this OSS note 332821 - C+ 065 or C+ 470 for split valuation & material ledger , it explains the reason and solution.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.