Block material for stock removal until goods receipt

Hi,

This is our current GR process

ASN -> inbound delivery -> TO creation (when goods physically arrive) -> TO confirmation -> customs declaration (outside SAP) -> GR

Goods are received in physical warehouse A with storage types Z01 to Z05.

Physical warehouse B is near to the KANBAN production line and has storage types Y01 to Y05. It is located 40km away from A

All Y and Z storage types are part of SAP warehouse REC.

We have following situation:

- every 2 hours a batch runs that replenishes the Y fixed bin storage types of warehouse B with the materials from the Z FIFO storage types of warehouse A.

- replenishment takes into account all WM stock in Z storage types


Requirement:

- replenishment should not take into account quantities that have been received in warehouse A without GR in MM/IM

- reason is that these quantities should not leave the premises of WH A as long as customs declaration is not ok


Possible solutions:

- GR before TO: not an option for business

- Move quantities on physical GR to another storage location than foreseen in the PO and move back when customs ok: business does not want to maintain additional storage location

- Other custo settings?

- User exit during replenishment (MWMRP002 - Replenishment control: TR quantity allocation)?

- Other?


Thank you for your valuable insights!

Geert

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • Best Answer
    avatar image
    Former Member
    Feb 25, 2016 at 11:27 AM

    Finally we could convince the business to receipt the goods under customs in a separate MM storage location.

    Since we are within a HU-managed environment the solution with storage location control in the warehouse does not work so we could not automatically move between storage locations via posting changes.

    The process we came up with is the following:

    - receipt of goods in new MM sor loc linked to same warehouse

    - confirmation of TO which places goods in final destination bin

    - automatic GR based on TO confirmations which allows Finance to already do the necessary. From a stock / MRP point of view all is correct

    - use HUMO to select all HUs linked with the inbound delivery and to do transfer between storage locations once go from customs is received

    In this last part we had to intervene because HUMO inbound delivery number search only returns results for HUs with object type 03. Since after GR HUs get status 12 but still have the inbound delivery number as object number, we allowed object type 12 in the inbound delivery number search for HUMO.

    Thanks again for all valuable inputs.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 01, 2015 at 03:54 PM

    Hi

    Have you considered a "Goods In" storage type in Whs A that all materials are initially receipted into. These would not be available for replen and could be moved into Z FIFO (LT10) once the customs part is completed ?

    Cheers

    A

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi

      Not sure if there is a BADI/FM to cover this. I used a similar solution but had the developer write a small piece of coding.

      Manish looks to have provided some guidance on possible coding.

      Cheers

      A

  • Dec 02, 2015 at 06:05 AM

    ASN -> inbound delivery -> TO creation (when goods physically arrive) -> TO confirmation -> customs declaration (outside SAP) -> GR

    Do you update any flag in system as a result of Custom declaration, How the SAP operator get trigger that Custom declaration has been completed and PGR can be done for the Inbound delivery. Might be that will give some idea how to handle this situation

    Add comment
    10|10000 characters needed characters exceeded

    • Hi Geert,

      Another way is you can control it through batch characteristics. Add or create usage decision ( released, blocked, ..etc) as one of characteristics in classification. we can check feasibility of considering only batch which has  released status( = custom clearance) for replenishment.

      Thanks and Regards,

      Prabakaran Gurusamy

  • avatar image
    Former Member
    Feb 10, 2016 at 11:55 AM

    Dear Geert,

    As mentioned by you, below is the document flow

    ASN -> inbound delivery -> TO creation (when goods physically arrive) -> TO confirmation -> customs declaration (outside SAP) -> GR

    Is it necessary for you to confirm transfer order on TO creation? if not then you can keep TO open and after custom clearance, on GR, TO can be confirmed. You can put logic in GR exist for checking TOs for inbound delivery and confirm them on PGR. But you need check, whether how destination bin is treated as which is fetched in TO for next TO.

    Another solution could be, you can set up batchjob to block and unblock quant. So on TO creation you can block quant there itself and unblock it on PGR or unblock it by settting up batchjob.

    BR

    Kamlakar

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 01, 2015 at 03:53 PM

    You could block the WM inventory on BIN, Quant, or SU level to avoid replenishment until customs clearance is complete. Your TR will not be converted to TO until you remove the block.

    BIN - LS02N - click stock removal block until customs clearance is complete.

    Quant - LS22 - removal block

    SU - LS32 - removal block

    Guessing quant level would work best in case you have multiple materials in the BIN or on SU.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Jacob,

      Thanks for your idea!

      Do you have any suggestion on how you could incorporate this in our GR process in an automatic way?

      I believe then we would need a way to block the quant or SU automatically after TO confirmation, but how will we differentiate between materials having and materials not having to pass customs?

      Next to this we would also have to find a way to automatically unblock the quant / SU after PGR.

      Are there any FM, BAPI or user exits that can be used?

      Best regards

      Geert