cancel
Showing results for 
Search instead for 
Did you mean: 

STMS:QAS->PRD transport requests releases without errors but not found in import queue..

Former Member
0 Kudos

Hello experts,

I'm having an unknown error ..i had configured stms successfully and i could  also transport requests from dev->qas successfully.But by the time when requests transporting from  qas->prod transport request can be released with out error but nothing reaches in import queue ..and my landscape details: dev and qas are in one system and prod in another separate system..while i'm searching i could found an error possible behind the unsuccessful transport that is checking transport groups..

and any ideas experts???!! Please share your valuable thoughts..

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello Experts,

Thanks for the response..issue got solved by the SAPNOTE  117395 - Authorization problems for file I/O on Microsoft Windows 

Once again thanks for your fine support..


Kind Regards,

Anoop.

Former Member
0 Kudos

Where is your central transport directory (SAPTRANSHOST) central server is it on the DEV/QAS box or PRD box?

If you get a green tick tell me what happens when you refresh the PRD transport queue, if you get errors post them here.

Former Member
0 Kudos

Hello Glenn,

Thanks for the reply..

central transport directory is in PRD server.While i'm checking transport tool for dev and qas i'm getting the same warning..but PRD trnsport tool check is working fine..that is PRD domain profile version is updating but for DEV and QAS it is not..! Any suggestions??also i had gone through the thread https://scn.sap.com/thread/988023 but issue remain still..


Former Member
0 Kudos

hello Anoop,

Please check sapmnt of dev server is shared with PSP and assign SAPServicePSP user with full permissions to the common transport directory in your case it might be dev system.

Regards

Anand

Former Member
0 Kudos

Hello Anand,

How can i share the Dev server sapmnt with Prd server user SAPservicePSP? after all these are 2 different servers..all i can do is adding SAPservicePSP user to sapmnt  folder resides in PSP system.common transport directory is in PSP production system in which the transport group and domain are configured..!

Former Member
0 Kudos

Can you share with us your parameters

Could you add the parameter CTC and set it globally or individually (as above) to 1.

Former Member
0 Kudos

Anoop,

I could understand from the error that your landscape consists of two different transport directories.

one is DEV and another PRD(PSP).

The error in Dev is searching for profile in development server where as according to you it should be looking for PSP which is common transport directory.

There is no connection between them.

You need to connect two domains.

Regards

Anand

Former Member
0 Kudos

Hello Glenn, Anand,

These are the parameters and the CTC value i have changed to 1 as you mentioned locally to the all 3 systems..

and Anand as from the above shown figure trans directory is same for PSD,PSQ and PSP which is resides in production server..

Former Member
0 Kudos

If i may ask ..How can i make the connection Anand?? I had added entries in the host file and service file as well, in order to connect 2 servers  ..

Former Member
0 Kudos

If you distribute the configuration to each server and retest is there any change?

Former Member
0 Kudos

Hello Anoop,

I remember i had addressed same query some time back

At that time it was stated your company had two transport directories.

you should check following SAP note.

1541076 - Preliminary checks and troubleshooting for transport issues

Connecting Domain:-

https://help.sap.com/saphelp_nw73/helpdata/en/14/c795388d62e450e10000009b38f889/content.htm

Regards

Anand

Former Member
0 Kudos

Yeah but getting error since  changed CTS parameter to 1 ..

Former Member
0 Kudos

Hi Anand,

Thanks for pointing out that ..But we have configured only one domain controller that is in production PSP and the trans dir resides in Production.and i said before that in transport tool parameters TRANSDIR is same for 3 systems..https://help.sap.com/saphelp_nw73/helpdata/en/14/c795388d62e450e10000009b38f889/content.htm this link is for connecting 2 separate domain controllers right? Do i need to change the current cts config and make one of the DEV or QAS in development server as Domain controller and try to link already configured PSP domain controller in production server ?

Former Member
0 Kudos

Anoop

Goto AL11 and try to double click DIR_TRANS.

Try the same on DEV, QAS and PRD.

If you are able to connect from all the systems then you have good confirguration.

Please check

Regards

Anand