Error code 312 after running CCR- differences in content

Hello Everyone

We are getting issues regarding mismatching of forecast consumption in ECC & APO systems. We have the screen shots of MD04 & RRP3 and we do see a visible difference.

As a first step, I ran CCR for PIRs in APO & found the error code 312- difference in contents (screen shot attached). There are no options of deleting them.

Also, in one of the previous post, it said to use the category 'EQ' in 'Maintain category Groups' Req.Reduction option in CFM1 txn | SCN

The above is maintained but we are still facing this error. The CIF model containing PIRs for the concerned material is very much active & not throwing any error.

Any reasons for this behavior?

Regards

Som

PIR- CCR error.png (56.6 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Nov 24, 2015 at 03:15 PM

    Hi Soumyajit

    You are performing FCST consumption in APO SNP?

    If yes then you can not perform CCR for planned independent requirement between ECC and APO.

    If you are releasing the FCST to SNP for FCST consumption why we also have FCST in ECC MD04. ideally we should have FCST or planned independent demand only in one system.


    Sorry for posting question back but I think we can have some mistake in basic concept itself.

    Please cross check and let me know if you require any additional information from my side.


    Thanks

    Amol

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Som

      It´s really difficult to say that consumption should match in ECC and APO as there are multiple factors require to consider. As you are simulation version in case delivery of sales order is happening it would be readjusting the consumption in ECC where APO it will not ? You could also different consumption configuration with both the systems so I would say it´s not ideal comparison.

      ECC is live system and surely there could be multiple things happening where in simulation version you might be having old picture so don´t compare them and I am sure it will never match 100%.

      Please request you to close the thread following How to close a discussion and why process.

      Thanks