cancel
Showing results for 
Search instead for 
Did you mean: 

Serial number issue-Production order release-PPRL

gyanaranjan_rout
Contributor
0 Kudos

Hi experts,

The serial number issue is seems to be very strange.

Number range has been maintained only for equipment category " S".

Equipment number range interval : From number : 000000000000000001 to ZZZZZZZZZZZZZZZZZZ number. and it has Flag ed for  External number range.

I have attached the Serial number profile.

Users are working with  serial number long time.

User has enter 2 serial numbers OE-30037979-04-001 and OE-30037979-04-002 during Production order XXX1 release, System allowing to us release. They are using so often. No issue.They are often using similar kind of serial number nomenclature

But when user has created another production order XXX2(recently).Entered  2 serial number OE-30037979-01-001 and OE-30037979-01.-002 and released the production. While saving the production order, System is throwing the below error message.

Number range does not exist for equipment

Message no. IS039

Diagnosis

No equipment (sapevent:DOCU_LINK\GL:equipment) number ranges have been created.

Procedure

Create the number ranges for the number range object EQUIP_NR.

Use the customizing function to allocate equipment categories to number ranges:

Proceed (sapevent:DOCU_LINK\DS:TRAN.OIEN)

  If you are not allowed to perform the function, contact your system administrator


Note:*** PM module has not Implemented***Only Serial numbers are using For logistic modules and CS.****


Please let me how to proceed to solve this issue



Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

In  IQ01 have you created Serial Numbers?

Check by Creating serial numbers directly in t-code IQ01 or IQ04.

Remove the check box from Indicator: Serial Number Existence Requirement in  OIS2 for

the particular serial no profile that is assigned in the work scheduling view of the material master.

Best Regards,

R.Brahmankar

gyanaranjan_rout
Contributor
0 Kudos

Yes ,we have tried create in IQ01/IQ04, but same error is coming.Already Serial Number Existence Requirement in  OIS2 Check Box has removed.

Find the work scheduling View attachment

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

The checkbox ExtReq. if marked signifies that the serial numbers must be precreated to be used.

OIS2 for Serializing  procedure PPAU & PPRLuse Serial usage 02 & 04 respectively.

Try by running the RISTEQ03 standard report to correct the missing status objects for serial numbers and equipments.

Best Regards,

R.Brahmankar

gyanaranjan_rout
Contributor
0 Kudos

Hi Rupesh,

Sorry for late reply. The root cause of the issue was serial level '1' not maintained in material master by user.  They are maintaining  material levels 1 for Serialized materials. We have maintained it and system allowed us to maintained serial number.

Issue is resolved. Closing the thread.

Answers (1)

Answers (1)

gyanaranjan_rout
Contributor
0 Kudos

attached the already released sample production order screen with serial number.

gyanaranjan_rout
Contributor
0 Kudos

Hi Experts,

Is there any update on this?