We have assigned DC521 to a resource, data collection is done for beyond min/max limits. We raised the non conformance and sent SFC to disposition route. Once SFC has started and completed at disposition operation it went in queue with same operation of production route. We started the SFC and clicked on complete, SFC is completed with out validating for data collection results which are recorded at same operation earlier.

Help on this is appreciated.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Nov 18, 2015 at 04:33 PM

    I would suggest this is a bug - what version of SAP ME are you running?

    The help for DC521 implies you need to run DC Edit to change the collected data to correct the problem, so DC521 should keep failing the SFC otherwise.

    Stuart

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      We had a similar issue (identified as a bug) that was since resolved with a patch - some of the testing we did that the developers found helpful was to try the same scenario except to run the SFC through a different resource after the Rework (disposition) was completed and you return to the original routing....

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.