erroor in ksii for price of activity overhead

hi frinds

i have cost elemnet 801001 in category 43 name of this attrac wage when we want settel pm orders to costcenter ihave error such as

Complete allocation structure Z3

Message no. KD503

Diagnosis

During settlement, the system puts the sender debits into groups
(assignments), which are settled using the same settlement cost element. The
settlement assignment is made in the allocation structure, which is stored in
the settlement rule for the sender (under settlement parameters).
Cost
element 801001 cannot be assigned to a settlement cost assignment in allocation
structure Z3, and therefore it cannot be assigned to a settlement cost
element.

Procedure

Possible solutions are as follows:

when i add this esecondery elemnt to cost elemnt group of pm .orders will be settel with another secondery cost elemt of type 42 that 802003

and 802003 is in over head cost element group . when i run ksii system calculte price of overhead wrong just for those of orders that settel with one line item that was801001 please tell me what i do ? i am confused

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

16 Answers

  • Posted on Nov 18, 2015 at 08:53 AM

    in ksii 82100 for pm


    1.png (10.5 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 09:29 AM

    Hi

    I think you should check your allocation structure Z3

    Go to OKOA and check allocation structure assignment where check that same cost element 801001 is not defined in source and Receiver CE

    Pl share screen shot of your allocation structure for better understanding

    Kamal

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 09:47 AM

    hi kamal

    i add 801001 in cost element group for allocation z3 but 801003 is category 43 when i assigen in this cost element group system post in co for pm orders such as this

    and in ksii price of overhead is incorrect in okes

    and in kah2

    i am sure system calcualte for overhead worng just for pm orders that have one line item that cost elemt 801001 please tell me what i do


    22.jpg (87.6 kB)
    21.jpg (51.8 kB)
    21.jpg (51.8 kB)
    20.jpg (113.8 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 10:42 AM

    no body doesnot answer?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 11:01 AM

    screen shot form okoa


    5.jpg (78.2 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 12:11 PM

    801001 is assign which cost elemnet group in overhead or pm order?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 12:13 PM

    in pm cost elemnt group in cluded but in price of overhead in ksii calculate wrong just for pm orders that have one line item with element 801001

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 18, 2015 at 12:27 PM

    hi kamal

    for this cost price of activity overhead is wrong.t


    40.jpg (39.9 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 19, 2015 at 04:23 AM

    price of overhead hust for cost of pm orderes that have one line item for activity allocation is in correct what i do ?

    please tell me what i do inkss2 , ksii


    1.png (10.5 kB)
    40.jpg (39.9 kB)
    41.jpg (57.2 kB)
    42.jpg (35.0 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 19, 2015 at 04:27 AM

    price of overhead just for cost of pm orders those have one line item for activity allocation is incorrect please tell me what i do ?

    in cost elemnt tr:kss2


    1.png (10.5 kB)
    40.jpg (39.9 kB)
    40.jpg (39.9 kB)
    41.jpg (57.2 kB)
    42.jpg (35.0 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.