on 11-12-2015 5:54 AM
Hi
I've inherited a PI 7.3 landscape with the normal 3 tier environment - DEV, QA and PRD. Each have their own SLD.
The business systems in each SLD have the same name but are based on different technical systems.
My problem is that when trying to setup SLD transport paths/groups the target drop down is always empty.
So for example I have ECC business system in both DEV and QA groups with related integration servers selected. But in the DEV SLD the QA group is always empty, so i cant select a target system for it.
What could be missing here?
Regards
Riaz
Hi Riaz,
The Business system names for DEV, QA and Prod should be different to setup transport target. And all the system should be present in all three SLD
e.g.
Dev integration system - PI with Dev group
Dev ECC bus system - ECC_DEV - associated with Dev integration system and part of Dev group
QA ECC - ECC_QA - Associated with QA integration system and part of QA group
Transport target
ECC_DEV --> ECC_QA
regards,
Harish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Harish
I agree they should be different, but whoever setup this up clearly didnt do it correctly and i'd like to fix it
Why am i unable to see any business systems in the QA group when trying to select a target in the DEV SLD tho? Surely it would show me a list of the business systems which are in the QA group and have the related integration server set to XIQ?
My question is why does the DEV SLD not see any targets in the QA at all but they correctly defined in the QA SLD?
Thanks
Riaz
Hi Vikas
I'll try to give an example of what i'm asking.
In the DEV SLD there is a business system called ABC, linked to the DEV group. In the QA SLD there is a business system called DEF in the QA group.
If i wanted to make DEF the transport target of ABC in the DEV SLD surely it would appear in the dropdown for the QA targets because the BS names are different right?
This is not happening at all, the DEV SLD has nothing in its QA transport target group.
Regards
Riaz
Hi Riaz,
My question is why does the DEV SLD not see any targets in the QA at all but they correctly defined in the QA SLD?
-->> Please check if the QA group and Business system is available in Dev SLD. If those are available in Dev SLD then you can see the QA system in QA group and add them in transport trarget.
regards,
Harish
would you want to do the grouping in dev?
you have to do the grouping in Qa and prod
QA system : Dev Business Sysem -->QA business system.
grouping should be done in target system where you need to import. DEV,QA,PROD landscape, groups should be mapping in QA,PROD.
it is not required to do it in DEV.
if you still want it in DEV, import the QA TS into DEV, create BS. import QA PI integration engine TS into DEV sld. create Integration_Engine_java_PIQ.
User | Count |
---|---|
90 | |
10 | |
10 | |
9 | |
7 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.