Skip to Content
author's profile photo Former Member
Former Member

Pick, Pass & Pass (User Driven) with LOSC

Hello Experts,

I am trying pick,pack,pass(user-driven) scenario using LOSC via conveyors--> moving to GI zone.

I have one storage type with 4 aisle, each aisle contains 4 activity area totally 16, I have maintained start-end bin for all the activity area.

when i try to execute in RFUI once the first activity area (first sub WO) picking is done, Pick-HU then branch out due to LOSC ...can't move to next activity area. what i required is all the sub-WOs to be completed first then connect to LOSC.

How can i Achieve this...

Thanks & Regards,

Raj

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 12, 2015 at 07:29 AM

    Hi!

    Check that your end point of current area = start point of next area

    BR, Alex.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Alex,

      Thnks for the reply. It still remains the same. its branching out after picking Product from first activity area to GI Zone Via Intermediate storage bin.

      whether Pick, Pack & Pass can work with LOSC???? If So, how can i achieve it?

      Regards,

      Rajiv

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.