cancel
Showing results for 
Search instead for 
Did you mean: 

Broken DCs in Cons workspace

Former Member
0 Kudos

Hello,


We had a contractor who upgraded our internet sales for ERP application with custom developments from ISA 7.0 to 7.32 SP 4. He created a track on our NWDI 7.3 system and resolved integration conflicts, merged our code with SAP code etc. Now that he left, we have our dev workspace and cons workspace out of sync. Which means our dev workspace has different number of DCs than our cons workspace(SC: SAP-SHRWEB). I also see there are broken DCs on the cons workspace. I am not able to perform an assembly on the cons workspace because of broken DCs. We know that the Dev workspace is perfect and working. How do we integrate or replicate the Dcs from Dev to cons workspace? Is there a way to sync up the DCs in both the workspaces?

Any help is much appreciated.

Thanks

MLS

Accepted Solutions (0)

Answers (1)

Answers (1)

junwu
Active Contributor
0 Kudos

DTR Console - Using the Development and Production Infrastructure - SAP Library

or

you can checkout all the file and check in them, activate and release the activity. then you can import to consolidation.

Former Member
0 Kudos

Thanks for your reply. There are hundreds of DCs. Do we have to checkout each one and activate and release them? Or is there an easier way of doing it?

junwu
Active Contributor
0 Kudos

I gave u two right?

Former Member
0 Kudos

Will the DTR replication from DEV to Cons workspace work if the target workspace is not empty?

junwu
Active Contributor
0 Kudos

can u just try.....