on 11-04-2015 6:27 AM
Hi all,
For strategy based task list, how to calculate the cost. I feel table wise logic will be complex, is there any bapi to calculate cost.
Thanks
Vivek Varun
Check out extractor 0PM_PRM_PLCS_1, it has possibility to extract cost for a task list or maintenance plan.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Vivek Varun
Have you had a look at IP31?
PeteA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I've just been looking at an old IP31 "Z" clone.
What I did was stopped the report at the following point:
*--- cost report
PERFORM display_costs USING dy_datuv dy_datub proto_p. <-- do not perform this step
In my case I needed data, but didn't need to display the standard IP31 screen (can't remember why)!!!.
It looks like I then exported the IP31 data from (SAPLCK00)AUFNR_KALKTAB[] to a calling program.
This should make sense to your ABAP Team...
PeteA
Pete,
Requirement is - when we create task list with maintenance package and generate order, cost of task list and cost of order ( as per package) will be same,now if user added a component or anything manually then order cost will be different from task list cost.
so to match the cost of order and cost of task list, this report is required. Now for task list cost (as per maintenance package) I have to pass many tables like based on package I will find operations and assigned activity type and components. then i have find cost individually for activity type and component and then cost as per number of hour and number component.
This will make report complex
So I need a simple logic or any bapi.
Thanks
Vivek
Vivek
If the order is created via a maintenance plan, then why don't you store the planned cost the first time the order is saved.
Then compare this saved value with the current value, this would be much easier..
Remember the cost of the task list will change over time as the labour/material prices change.
PeteA
Vivek,
Maybe I'm missing something obvious here... But I still don't understand why you need to get the costs from the task list..
If the order was created from the task list, then when it is saved the system will calculate the costs for that order. So these will be the same as the costs on the relevant task list operation(s) that were determined by the strategy plan.
If you store this data the first time the order is saved, then you have a datum to check against at a future point. And it works for every order..
PeteA
Pete ,
Thanks again for your reply .
Look scenario is as the order gets triggered from the maintenance plan , task list cost and order cost will be same . But if some more operations/components are added , then cost will differ .
So we can track that actual cost order is having , but facing difficulty in finding out the original task list cost associated .
So is there any table which will store the Planned cost data of the order when first time it was triggered/saved as in AUFK i am able to find the date stamp but not the original cost .
Pete ,
I went thru the thread , but still i am nowhere .
The point is to find the table which will store the order planned cost when it was created or released coz it will get changed as some manual entry of operations or materials is done at any stage .
I tried table PMCO , but it overwrites the planned cost if changes are made within the same period .
So my requirement is to have the original planned cost of the order at the time of create/release.
Vivek,
This gets a little technical, so I hope it makes sense..
In user-exit IWO10009, at the point of saving the order for the first time, the cost data is not yet stored in any database tables. Instead the data is held in SAP's memory (internal tables).
So now the trick is to :
Hope this helps..
PeteA