on 11-03-2015 10:30 PM
Hi Experts,
In REM, I have a planned order that has 2 reporting points. I have reported backflush on reporting point 1 for some quantity. the component quantity is good issued. but the requirement quantity for this component is not reduced in RESB of the planned order.
I found a note for this 459960. This note explains the behavior but it says sap doesnt have any solution for this.
my issue is when I run mrp after reporting point backflush, system thinks the component is still needed (because the requirement qty is unchanged) and orders more procurement proposals. in reality I have backflushed the component and I dont need them anymore.
what options do I have as a workaround?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
That document just explains how dep reqs withdrawal quantity works..my issue is after rep point backflush, mrp does not respect the component withdrawal quantity..
For example
Comp requirement quantity is 10 for operation 1..i did rep pt backflush of op 1 and 10 quantity of comp consumed. When i run mrp system plans for 10 comp again.. but in reality it should not because i have consumed them and i dont need more.