Skip to Content

Automatic TR not created when Production Order is released

Hello Everyone,

I am new to SAP PP area. In our system for other plants and storage locations when production order is getting released the TR gets created and when they go to LM01 transaction they are able to pick the order without any issues.

I have created 2 new supply areas for returns and repairs. I have also created conrol cycles. Now when the company creates production orders for returns or repair plant and release them, system is not generating TR.

Am I missing any configuration steps ?

Thanks in advance,

Khushbu.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Nov 02, 2015 at 08:46 PM

    Hello

    You must create a production scheduling profile on transaction OPKP and make sure that the proper value is set for the field "WM Request". After that, this profile must be assigned to the material master.

    Regards
    Caetano

    Add comment
    10|10000 characters needed characters exceeded

    • Khushbu,

      Check whether below steps are in place?

      1.Production supply area created in PK05

      2.Control cycle defined - Must set the WM request flag at the production control level, if you want the material staging for production orders to take place automatically and If you want to use automatic staging, it is essential that the materials used in connection with this interface are assigned to a production storage location and contain a production scheduler


      3.Check whether PSA is assigned to your Workcenter


      4.Production scheduling profile setting for WM TR request.

      BR
      KK

  • Nov 09, 2015 at 09:49 PM

    Hi Kiran,

    Thanks for replying. I have made the settings that you have mentioned but still when I go to LM01 transaction to pick the production order I get a error message that "Open reservation for order does not exist". I can only pic the orders through MIGO not with the RF gun.

    How to resolve this.

    Thanks,

    Khushbu.

    Add comment
    10|10000 characters needed characters exceeded

    • Khushbu,

      Whether your initial issue about TR creation is resolved?

      You said you can check order in MIGO but not in LM01 in that check with your technical guy for RF gun setup and also let us know the complete error description with message number.

      BR
      KK

  • avatar image
    Former Member
    Nov 10, 2015 at 01:14 AM

    Hi Khushbu,

    Hope the PSA (production supply area is maintained in BOM or in PV in material master).

    Also please do the OMK0 setting - Define replenishment control for storage type.

    Thanks

    Kishan

    Add comment
    10|10000 characters needed characters exceeded