on 11-02-2015 1:50 PM
Hi, How I can extract the material consumption from two date (DD.MM.YYYY)? I need a transaction like MC.9, but instead the Month I need to select specific date. Thanks and regards. Antonio
Hello ,
you can use the transaction MB5B , here you can provide he date range and system will show you the goods received and issued on the day along with the balances.
i think you should google before posting Question for reports.
thanks
kUnal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hello,
this movement will place stock in store right then it should consider it...?
if you need movement specific then you can go for MB51 , you can provide posting dates , then set of movement types you needed , in output just use totals
or develop a report with all your requirement.
Also try the table MVER , it stores the total consumption.but not special stocks.you can see it in the additional data of material master.
thanks
kUnal
Please check the report MB5B (Stock on posting date).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.