on 11-02-2015 11:43 AM
Hello Experts,
Can someone please tell me where overtime rate gets calculated
Scenario:
AS-IS
For Biweekly payroll(07/12/2015 - 07/25/2015) - there is a split in Base Salary in week 1
Week 1:
Basic pay for 07/12/2015- 07/15/2015 = 25.59/hr 34 (no of hrs worked) 34*25.59 = 870.06
Basic pay for 07/12/2015- 07/15/2015 = 28.03/hr 6 (no of hrs worked) 6*28.03 = 168.18
Total Salary = 1038.24
Overtime hours Worked = 12 hrs.
Overtime Rate Calculation : Total Salary for 1st week/ Planned Working hours = 1038.24/40 = 25.956*1.5 = 38.934/hr
can anyone please tell me where ( Total Salary for 1st week/ Planned Working hours) is getting calculated as i have to replace planned Working time with actual Working Time for OT calculation.
Hello Experts,
Thanks for your responses..
But I figured out Overtime calculation is happening in RGRTE function by taking inputs on how it should be processed from processing class 85 of the overtime WT.. I have changed the PC 85 as 3.. now the calculation is happening as expected..
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In your example you have mentioned same week details two times in two different rate or these two rate's are different. Please explain once again.
Can you share the PARTA table details for the 1st week payroll run log.
Regards,
Sankarsan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1st Check if suppose your payroll period say 08 and same time when you will be running time evaluation for that period it's also same period 08.
That means time evaluation period will be equal to payroll period. Once it's done then you can build the below logic in the time evaluation.
Process Logic:-
Create a one time wage type which will store the actual working hours and overtime hours upto 1st week of the time evaluation period.
Whatever amount is getting updated to wage type 2000 and 2101 it should be updated to this new time wage type XXXX.
Once it will reach to weekend then it will be stop to added to new wage type XXXX and as well as nit for the next week(you can add upto next 5day's once system on the 6day then it will not be added).
So end of the time evaluation period you can get the details of 1st week wage type 2000 & 2101 amount will be transferred to wage type XXXX.
Then in the payroll section you will calculate overtime rate by this wage type XXXX which is stored 1st week actual working hours and overtime hours.
Think and design this in the time management system with PCR and then redesigned the Payroll PCR of overtime calculation rate with the help XXXX wage type.
Regards,
Sankarsan
Do you know how to configure V_T510S table, If yes configure V_T510S for actual hours and over time accordingly system generates the wage types XXXX, YYYY.
Later at the end of the period in payroll with the help of generated wage types Query the required components and pass it to the output table.
This is one of the ways of doing it, you start configre system while doing if you face any challenges let us know we suggest accordingly.
Regards
Venkatesh
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.