Help with Planning Using Phantoms

All,

My business is a complex sheet metal manufacturing cell with around 1600 live materials passing through at any one time and is currently set up as MRP driven. Due to this it is dificult to create stability in the planning as our demand signal is varying and we dont have resource to manage 1600 items at MPS.

A lot of these parts are supplied to internal assembly lines and have the same point of consumption so what I am proposing is to look at planning using Phantoms. if my understanding of this process is correct it will allow me to create a KIT phantom of parts with the same consumption point and plan this phantom as an MPS in mf50. Once the planning is complete at phantom KIT level MRP will then manage the base components to the phantom plan.

This is not currently used anywhere in my organisation so my understanding is only what i have read so i may have mis understood this function but please feel free to correct me if this is the case

From what i have found so far this requires special procurment type 60

Will this work how I understand or is there another way?

If this will work can sombody please explain to me how to set this up and what parameters are required?

Ideally if anybody currently uses this in the UK in a similar enviroment/ scenario and would be willing for me to come visit your business. I would be intrigued to see fully how this process works and how this is set up

Thanks in adavance for your help

Regards

Ben Mitchell

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Oct 30, 2015 at 05:45 PM

    Hi Ben

    This concept is quite simple.

    You should just define the special procurement for the material that will be a phantom and create a BOM for it.

    Then, you include this phantom material on the parent material BOM and during the creation of a new planned order for this parent material or during the backflush of this parent material, all the phantom components will be considered.

    BR
    Caetano

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 31, 2015 at 06:30 AM

    Hi,

    http://scn.sap.com/thread/776104

    Pls follow the link for creating Phantom material.

    Thanks With Regards,

    Dinesh V.