on 10-30-2015 10:20 AM
Hi Experts,
I have an issue while configuring DIP profile.
we need quotation to be created from PS ECP, while configuring DIP Profile, in source, I am not getting Planned Cost - Line Items.
what should be done, so that I can have the option to select PLANNED COST - LINE ITEMS wise in source drop down menu.
Guidance on the same required urgently. Screen shot attached for reference.
Hi Murthy,
you should select Easy cost planning as you are using ECP. than maintain characterstics to show line items as check summarize/no summarize.
if you have different requirement than let me know.
thanks
Sunil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Murthy,
I assume that you need plan items to be displayed in the Sales Quotation. If this is your requirement then you need configure characteristics according to it .
Thanking you
Vengaiah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vengaiah,
You are correct, Plan items needs to be displayed in Sales Quotation.
I have selected Material and Cost Element with check on Char rel, Mat Determination, and Structuring.
In source I am not getting PLANNED COSTS - LINE ITEMS.
Hi Sunil,
With further discussion with customer, we are not going with ECP. hence looking for the option as mentioned above. Sorry for the wrong information given in my query.
During othe searches, I came acroosa suggestion to update the table AD01SRC in SM30. or run exit: EXIT_SAPLAD15_005.
I wonder why this is not coming in standard in drop down. Plz help.
Regards,
Murthy
Hi Vengaiah,
the scenario is as below.
we create project structure based on Inquiry. project structure as below.
Proj Defn
L1 WBS
L2 WBS
Network
Activity1 with Work Center and Duration details
Material Component1 with Qty and L Itm Cat
Material Component2 with Qty and L Itm Cat
Activity2 with Work Center and Duration detail
Activity3 with Work Center and Duration detail
Material Components will be around 10 nos and we will be using around 15 activities each with diff work center/cost center combination.Above I have shown sample structure.
Costing method is Network Costing. we are getting planned cost in our reports.
we need to transfer all this plan line items to quotation. Materials used in NWA are billable items and activities are to be mapped as service materials in Sales.
DIP Steps:
Material with check on Char Rel, Mat Deter,
Obj No with Char Rel
Trans Currency with Char Rel, Mat Deter
Unit of measure with Char Rel, Mat Deter
4. Source - I am not able to select - Planned Cost - Line Items.
Is my steps, correct. why I am not getting line items in planned cost.
Set for Material and Cost Elements are created and ready for further assignment.
Please suggest where did I miss in config, or what is the problem.
Regards,
Murthy
Hi Murthy,
Select no summarization for cost element , material and objnr.
In source select Planned costs -total records.
In material determination map characteristics to Materials. And try this in creating Quotation.
First see that all plan costs are coming in DP81 . Then we can re iterate config according to the final requirement.
Thanking you
Vengaiah
Hi Vengaiah,
the scenario is as below.
we create project structure based on Inquiry. project structure as below.
Proj Defn
L1 WBS
L2 WBS
Network
Activity1 with Work Center and Duration details
Material Component1 with Qty and L Itm Cat
Material Component2 with Qty and L Itm Cat
Activity2 with Work Center and Duration detail
Activity3 with Work Center and Duration detail
Material Components will be around 10 nos and we will be using around 15 activities each with diff work center/cost center combination.Above I have shown sample structure.
Costing method is Network Costing. we are getting planned cost in our reports.
we need to transfer all this plan line items to quotation. Materials used in NWA are billable items and activities are to be mapped as service materials in Sales.
DIP Steps:
Material with check on Char Rel, Mat Deter,
Obj No with Char Rel
Trans Currency with Char Rel, Mat Deter
Unit of measure with Char Rel, Mat Deter
4. Source - I am not able to select - Planned Cost - Line Items.
Is my steps, correct. why I am not getting line items in planned cost.
Set for Material and Cost Elements are created and ready for further assignment.
Please suggest where did I miss in config, or what is the problem.
Regards,
Murthy
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.