Skip to Content
avatar image
Former Member

How can two cost centers be assigned to one valuation area in OKB9

Hello,

How can two cost centers be assigned to the same valuation areas?

I know if we enter valuation area for one of the entries then it is possible -

Is there a way that we can do the same thing without the valuation area, simply the valuation area and the cost center?

Thanks & Regards,

Suresh

Capture.PNG (6.4 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Oct 28, 2015 at 11:31 AM

    Hi Suresh

    No..in standard you can't do. because CCtr is defined at Co Code level not in plant level.

    Kamal

    Add comment
    10|10000 characters needed characters exceeded

  • Oct 28, 2015 at 11:19 AM

    Hi,

    Requirement is interesting...Most of the clients asking this, but what you are expecting by assigning two cost centers to a single valuation are...?

    It is better to capture with one cost center later on you can re-post the amounts by using KB11N.

    Let me know the exact requirement in detail....

    Regards,

    Pavan Kumar Arvapally

    Add comment
    10|10000 characters needed characters exceeded

    • Hi Suresh, 

      There may be N number of materials under the same valuation area it doesn't mean that  we need to assign a different cost center for each material.

      It is better to go with a single cost center there by distribution as per the requirement...

      Hope you get the clarity....

      Regards,

      Pavan kumar Arvapally

  • avatar image
    Former Member
    Oct 28, 2015 at 11:50 PM

    Hi..

    You can use substitution user-exit instead of okb9.

    You input your logic which select the correct cost center  to substitution user-exit.

    Add comment