Dear Team,

I am going through the SAP note 1880374. In this the following two solutions have been given.

1. Change the customization in OMJ5 for movement type 262 as "No Check" in stead of "Enter and Check"

2. Change the posting process for mov type 261 and 262 for production order.

     2.1 Unset the back flush indicator

     2.2 Post (261) and cancel (262) material movements in MM transactions like MB1C in stead of CO11 & CO13

     2.3 In MM transaction (eg: MB1C) shelf life date can be entered for mov typ 262

But I am thinking of another solution of "Activating option "Enter and Check" for the mov type 261 in OMJ5". Will this NOT work? Will this configuration make any issue?

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Oct 28, 2015 at 09:47 AM

    This customizing refer to a date at which the batch was produced.

    MOvement type 261 didn't post produced materials, it post material which are already in stock. Why the 261 movement should ask for a production date. I cannot imagine that the standard process work with this setting.

    The activation of this flag for 262 is already a custimizing error from standard point of view, as 262 is no real goods receipt. It's the cancellation of an goods issue. So this material / batch is already existing.

    BR Sabine