Skip to Content

PREP_SETUP/RUN_GENPUTTBSHD Error during DMO for SUM

Hi guys

While running DMO for SUM Im facing the following error.

Job completes successfully after 3 seconds, but SUM shows it as an error.

SUM version is SP14

Any idea what does mean that message?

PREP_SETUP/RUN_GENPUTTBSHD

1EETQ399 Last error code set is: No new lines found in logfiles.

1 ETQ201 Entering upgrade-phase "PREP_SETUP/RUN_GENPUTTBSHD" ("20151028020319")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_mss_schema=bwx

1 ETQ206 Executing pre-phase DB specific actions 0/1.

1 ETQ200 Executing actual phase 'PREP_SETUP/RUN_GENPUTTBSHD'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'RS_GENERATE_PUTTB_SHD'

2 ETQ399 Arg[1] = 'SAP_TMPLOG'

2 ETQ399 Arg[2] = ''

2 ETQ399 Arg[3] = 'RS_GENERATE_PUTTB_SHD\.$(SAPSID)'

2 ETQ399 Arg[4] = '5'

2 ETQ399 Arg[5] = 'PUTTB_SHD generation'

1 ETQ399 Using error summary log 'GENPUTTBSHD.ELG'.

1 ETQ399 Expanded phase arguments:

2 ETQ399 Arg[3] = 'RS_GENERATE_PUTTB_SHD\.BWX'

4 ETQ265 Starting report "RS_GENERATE_PUTTB_SHD" with variant "SAP_TMPLOG" in batch

1 ETQ359 RFC Login to: System="BWX", AsHost="UYCLS143" Nr="00", GwHost="UYCLS143", GwService="sapgw00"

2 ETQ232 RFC Login succeeded

4 ETQ010 Date & Time: 20151028020319 

1 ETQ233 Calling function module "SUBST_START_REPORT_IN_BATCH" by RFC

2 ETQ373 parameter "IV_ABORT_ON_ERROR" = ""

2 ETQ373 parameter "IV_AUTHCKNAM" = "DDIC"

2 ETQ373 parameter "IV_BATCHHOST" = "UYCLS143"

2 ETQ373 parameter "IV_JOBNAME" = "RS_GENERATE_PUTTB_SHD"

2 ETQ373 parameter "IV_REPNAME" = "RS_GENERATE_PUTTB_SHD"

2 ETQ373 parameter "IV_SCHEDEVER" = " "

2 ETQ373 parameter "IV_VARIANTTEXT" = "Gen. PUTTB_SHD from PUTTBX"

2 ETQ373 parameter "IV_VARNAME" = "SAP_TMPLOG"

2 ETQ373 parameter "IV_LANGUAGE" = "E"

2 ETQ399 Table TT_REPORTPARAM (#1):

3 ETQ399 "LOG_DIR","P","","","tmp",""

2 ETQ373 parameter "IV_BATCHINSTANCE" = ""

1 ETQ234 Call of function module "SUBST_START_REPORT_IN_BATCH" by RFC succeeded

4 ETQ010 Date & Time: 20151028020319 

2 ETQ373 parameter "EV_JOBCOUNT" = "05031900"

2 ETQ374 parameter "EV_STARTRC" = "0"

2 ETQ374 parameter "EV_VARIWRC" = "0"

4 ETQ311 Batch job "RS_GENERATE_PUTTB_SHD" with job count "05031900" scheduled

2 ETQ399 20151028020319: Job RS_GENERATE_PUTTB_SHD jobcount 05031900 still running...

1 ETQ359 RFC Login to: System="BWX", AsHost="UYCLS143" Nr="00", GwHost="UYCLS143", GwService="sapgw00"

2 ETQ232 RFC Login succeeded

4 ETQ010 Date & Time: 20151028020324 

1 ETQ233 Calling function module "SUBST_CHECK_BATCHJOB" by RFC

2 ETQ373 parameter "JOBNAME" = "RS_GENERATE_PUTTB_SHD"

2 ETQ373 parameter "JOBCOUNT" = "05031900"

2 ETQ373 parameter "IV_VERIFY" = " "

1 ETQ234 Call of function module "SUBST_CHECK_BATCHJOB" by RFC succeeded

4 ETQ010 Date & Time: 20151028020324 

2 ETQ373 parameter "JOBSTATUS" = "F"

2 ETQ374 parameter "RC_CHECK" = "0"

2 ETQ373 parameter "JOBENDDATE" = "20151028"

2 ETQ373 parameter "JOBENDTIME" = "050322"

4 ETQ263 Batchjob "RS_GENERATE_PUTTB_SHD" finished successfully

2 ETQ399 Phase RUN_GENPUTTBSHD is now finalizing...

2 ETQ399 Phase RUN_GENPUTTBSHD: Finalize OK

4 ETQ010 Date & Time: 20151028020325 

1EETQ399 Last error code set is: No new lines found in logfiles.

1EETQ203 Upgrade phase "RUN_GENPUTTBSHD" aborted with errors ("20151028020325")

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Nov 07, 2015 at 09:41 PM

    Hello,

    In my opinion we can try two option:

    1> take a backup tmp directory under SUM and clear it up. Retry the aborted phase.

    2) You can also try to update kernel for DIR_PUT\exe  to latest and retry the phase.

    Hope fully you will be able to move forward.

    Regards, Prem

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 17, 2015 at 05:18 PM

    During SUM run you should never change the DIR_PUT profile. SUM (including DMO) does not require a manual change. The SUM tool sets the parameter DIR_PUT in phase SWITCHPARAM_UPGDIR if necessary.
    Kind regards,
    Christiane

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 28, 2015 at 03:09 PM

    Hello Martin ,

    Could you please share Phase name with us... also you can identify the errors in st22 or in job logs for more details.

    can you please paste the DMO screenshot here.

    Thanks

    Dev

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Martin Simois

      Hi

      I'm facing the same error with SUM SP14 in phase PREP_SETUP/RUN_GENPUTTBSHD

      while installing EHP 7 on ECC 6.00

      As show in GENPUTTBSHD.LOG file, job RS_GENERATE_PUTTB_SHD is scheduled executing report  with the same name and variant SAP_TMPLOG.

      I've checked this report with trx SE38 and I noticed that variant SAP_TMPLOG does not exists so job log is empty

      Any ideas?

      Thanks