cancel
Showing results for 
Search instead for 
Did you mean: 

work center issue

Former Member
0 Kudos

I am creating Work Center using t-code IR01 then  I entered Basic data values with work center category 0001 an standard value key SAP1, then checked technology tab the fileds Sort string and CAPP planner group values automatically getting updated.

  Can anyone explain from where those values are coming and any configuration have to do.

Regards,

Bala S

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Path in SPRO.

Regards

Vivek

Former Member
0 Kudos

Thanks for your reply Vivek,

When I creating work center the following details Sort string and CAPP planner group automatically get updated in Technology data.  I Want to know how it is?

  

Former Member
0 Kudos

Hi Bala,

I am not sure if CAPP data assignment possible to technology using configuration.I suggest, Take help from your ABAP team and look for any changes from coding side.

Regards

Vivek

MTerence
Active Contributor
0 Kudos

Hi Bala,

The default work centre setting has been made in OP42

Go to the transaction and check it.

Regards

Terence

jogeswararao_kavala
Active Contributor
0 Kudos

Hello Bala,

If you are creating a Work center for PP module (category 0001) then use tcode CR01. If you are creating Work center for PM (category 0005), then use tcode IR01.

For the question on from where, study this spro path:



KJogeswaraRao