on 10-23-2015 4:30 PM
Is there a configuration setting where I can decouple a pick TO confirmation from automatically setting the Kanban full signal (Classic Kanban, stock transfer replenishment)?
I'd like my tugger train driver to do the TO confirmation to pick the item from storage and deliver it to the supply area. At supply area, I'd like the material handler to put the item into its final place and then trigger the Kanban Full signal.
I recognize that I can do a two-step confirmation or even two-step picking via drop off zone...just wondering if Kanban Full can be a separate transaction from the TO confirmation.
Thanks, Vlad
Hi Vlad,
Could you please help to explain this issue in more detail with your requirement. Maybe, with screenshots; process flow it would be much easier.
Thanks,
Balaji
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The process is as I explained above:
I'd like my tugger train driver to do the TO confirmation to pick the item from storage and deliver it to the supply area. At supply area, I'd like the material handler to put the item into its final place and then trigger the Kanban Full signal.
I'm just trying to get system confirmation of every manual handling step, and a Kanban Full confirmation is an easier transaction than a TO confirmation. But I think I need to head into the two-step TO confirmation direction, as decoupling Kanban Full from TO confirmation doesn't seem possible.
User | Count |
---|---|
89 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.