Hi,

We have a scenario, where the down time should not be included for idle shifts. It is like this,

Company runs only in general shift i.e. 08:00 to 17:30 and has a lunch break for 30 mins from 13:00 to 13:30.

When a notification is raised by production department for maintenance, they are entering malfunction start date and time with breakdown indicator.

Say the breakdown started on yesterday 10 AM and the work is completed on today at 11 AM. Here the actual down time is only 10 hours. But when we are closing the order by entering end of downtime/malfunction time it is calculating 25 hours.

Following settings are done for the equipment and wok center

1. Work center assignment in equipment master

2. General shift definition in OP4A

3. Assigned grouping in capacity details.

Please help me how to resolve this issue. I could be better if the solution is explained with all required settings/document.

Thanks

Jagan B

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 23, 2015 at 11:01 AM
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 23, 2015 at 10:57 AM

    Hello Jagan,

    If the requirement is of a report addressing these aspects, then go for a Infoset Query or an ABAP report where this idle time can be suppressed and the field/s can be calculated as per your requirement.

    Regards

    KJogeswaraRao

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.