SNP Location Heuristic does not work correctly

Dear Guru´s,

a short discription to our Situation:

We have demands in our DC 8100 for the next couple of months, all our product have procurement type F. A T_Lane is allready set to production plant 8000. When we start the Location heuristic the System generates only stock Transfers for the first and the fourth month. Actually i have no idea how to fix this because we want receipts for all demands.

SNP_Heuristic1.JPG (198.5 kB)
SNP_Heuristic2.JPG (187.7 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 23, 2015 at 09:33 AM

    Hi Pierre

    Are you running the location Heuristic only for DC 8100.?

    I think there could be multiple reasons, looks for your lot size or calendars defined at DC/Plant or on transportation lane. You could also check the lead time ?


    Thanks

    Amol


    Add comment
    10|10000 characters needed characters exceeded

    • Pierre,

      Can you check the details of the Receipts being generated at "8100" like Opening Date, Start Date, Start Time. Make sure it is consistent with all the lead times maintained. ( T-Lane, Planned Delivery Time, GR/GI processing time for the product at both Plant and DC). You could also try removing the Target Days' Supply from the Product at DC and run Location Heuristics.

      Regards

      AK