Production order confirmation problem

Hi all,

I am facing a problem in saving confirmation for the production order. and system is showing the following error.Please suggest the possible solution. What changes have to be made in material master for Batch management for the following problem?

thanks in advance

pastedImage_2.png (19.4 kB)
pastedImage_3.png (29.6 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Oct 23, 2015 at 07:04 AM

    Hello,

    Batch creation KZECH is set in the material master for a component Batch entry = 2 in MRP 2 view and material in WM managed. You can change it to 3   Automatic batch determination upon release of order.

    Or Implement OSS note  381778 - Confirmation: no batch determination for WM materials

    Best Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded

  • Oct 23, 2015 at 06:39 AM

    Dear Prasad Inamdar,

    Hope you are doing the Auto GI / GR against the production order through the confirmation

    the material is batch enabled hence please maintain the Batch number in the production order(CO02) --> component overview

    Regards,

    Venkatesh..


    Add comment
    10|10000 characters needed characters exceeded

  • Oct 23, 2015 at 06:35 AM

    Hello Prasad,

    As per your second picture of error, It's clearly mention " No batch Specified in Production order"

    Please assign the batch against the prod order and check once again .

    Regards

    Umesh Mali