ATP (confirm partial availability) for simple discontinuation

Former Member
0 Kudos

Dear SAP Guru,

we have some issues regarding ATP (confirm partial availability in production scheduling profile set) and simple discontinuation (set in material master MRP4), for example MM-DISC is to be followed up to MM-FOLL,

MRP is run without considering ATP, if material to be discontinued is not enough, required is directed to follow up in planned order.

For example:

Planned order A 100 PCS, will required component

1. AA 100 PCS

2. MM-DISC 75 PCS (only 75 in stock, requirement is directed to MM-FOLL for 25 PCS)

3. MM-FOLL 25 PCS

We have problem when planned order is converted to production order, we have confirm quantity 0 set (since AA is zero so nothing is committed), so the production order component will be

1. AA 100 PCS --> not commited

2. MM-DISC 75 PCS --> not commited

in MRP run we need to buy againMM-DISC 25 PCS, so the discontinuation process is always failed due to ATP.

Please kindly share you advice, or can we make ATP in production order just use component from planned order??

Thank you very much.

best regards,

Freddy

Accepted Solutions (0)

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Please check OSS notes 939141 - Incorrect confirmed date of follow-up material

1112075 - Simple discontinuation: incorrect qty follow-up materl w/ATP

Best Regards,

R.Brahmankar

Former Member
0 Kudos

Dear Sir,

Good day, unfortunately these notes not vallud for our version anymore.

We are running SAP HANA SAP_APPL 617.

Is there anything else we should check??

Best regards,

FreddyHa

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

In this you can use the Alternative item rather than discontinuation. Also I would suggest to raise message to SAP.

Best Regards,

R.Brahmankar

Former Member
0 Kudos

Hi Sir,

Currently we are opening OSS notes asking for the logic between ATP and simple discontinuation in production order. The logic seems not align together to achieve business goal (discontinuation).

Will inform back asap after SAP answer the notes.

Thank you very much.

Best regards,

Freddy