Costing for a Material

Hi Gurus,

A2 is By product in M1 BOM and M1 is Byproduct in X1 BOM as below

Material M1 BOM contains A1 and A2

Material X1 BOM contains A1 and M1

M1 (qty20) A1 10 A2 -20 X1(Qty20) A1 10 M1 -20

I need to do the costing for M1 how much percentage M1 produced in both the ways ? What costing approch we need to setup in the system

Appriciate your early reply

Thanks

Sastry

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 23, 2015 at 03:17 PM

    Anybody please answer my query.

    M1 is produced by one BOM 60%  and as a byproduct it will come 40% now I need to do costing for M1 which inculdes 60 % and 40% , and provide me a weighted average cost of M1 if i will use Ck11n T code.