Skip to Content
avatar image
Former Member

I created in cs01 bom 2 but when creating bom2 selection pop up am not getting please help me how to rectify it

I created in cs01 bom 2 but when creating bom2 selection pop up am not getting please help me how to rectify it

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

7 Answers

  • Oct 22, 2015 at 05:39 AM

    This message was moderated.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 22, 2015 at 05:40 AM

    Hi Karthik,

    Please elaborate more, what actually you want to do so that any one can give you some solution.

    If you do not describe your problem in detail how you will get the solution.

    Regards

    S Ahmed

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 22, 2015 at 06:10 AM

    Thank you for your suggestions

    Actually i created alternative BOM for One excited material in CS01. In CS03 am able to see that alternative BOM2 .

    But while creating Production order in CO01 i want select BOM2 but am unable to select BOM2 how to select BOM2 where can i select BOM2 in CO01

    Add comment
    10|10000 characters needed characters exceeded

  • Oct 22, 2015 at 07:12 AM

    Hello Karthik,,

    Please check the below detail:

    In Material master MRP4 view, Which selection method are you selected?

    Please check the below screen shot and set selection method according to your requirement

    According to above definition of each point, check your lot size, prod version and test once again.

    I hope this information help you

    Regards

    Umesh Mali


    Alt BOM.PNG (25.3 kB)
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 23, 2015 at 02:10 AM

    Hi karthik,

    There should be a business need when you create alternate BOM for example with base qty component qty changes. With time validity component changes.

    When we create alternative BOM, we have to link them with the production version as per lot size or the validity.

    Refer the link . https://sap.scn.com/thread/3236019

    Thanks

    kishan

    Add comment
    10|10000 characters needed characters exceeded

  • Oct 23, 2015 at 04:45 AM

    Dear Karthik Annam,

    If the parent material has two BOM's then with respect selection method from MRP4 view system will pick the BOM based on validity

    similarly

    if you have two BOM's then please maintain the PV in the MRP4 view then while creating the production order system will populate the selection option for selecting the Production version which is having BOM and Routing details for carryout that production order

    Regards,

    Venkatesh..

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 24, 2015 at 01:59 PM

    Dear Experts

    Thank you very much for your suggestion

    I resolved my issue

    I created PV for material thank you

    Add comment
    10|10000 characters needed characters exceeded