cancel
Showing results for 
Search instead for 
Did you mean: 

I created in cs01 bom 2 but when creating bom2 selection pop up am not getting please help me how to rectify it

Former Member
0 Kudos

I created in cs01 bom 2 but when creating bom2 selection pop up am not getting please help me how to rectify it

Accepted Solutions (0)

Answers (7)

Answers (7)

Former Member
0 Kudos

Dear Experts

Thank you very much for your suggestion

I resolved my issue

I created PV for material thank you

former_member185450
Active Contributor
0 Kudos

Dear Karthik Annam,

If the parent material has two BOM's then with respect selection method from MRP4 view system will pick the BOM based on validity

similarly

if you have two BOM's then please maintain the PV in the MRP4 view then while creating the production order system will populate the selection option for selecting the Production version which is having BOM and Routing details for carryout that production order

Regards,

Venkatesh..

Former Member
0 Kudos

Hi karthik,

There should be a business need when you create alternate BOM for example with base qty component qty changes. With time validity component changes.

When we create alternative BOM, we have to link them with the production version as per lot size or the validity.

Refer the link . https://sap.scn.com/thread/3236019

Thanks

kishan

UmeshMali4994
Active Contributor
0 Kudos

Hello Karthik,,

Please check the below detail:

In Material master MRP4 view, Which selection method are you selected?

Please check the below screen shot and set selection method according to your requirement

According to above definition of each point, check your lot size, prod version and test once again.

I hope this information help you

Regards

Umesh Mali

Former Member
0 Kudos

Thank you for your suggestions

Actually i created alternative BOM for One excited material in CS01. In CS03 am able to see that alternative BOM2 .

But while creating Production order in CO01 i want select BOM2 but am unable to select BOM2 how to select BOM2 where can i select BOM2 in CO01

former_member189817
Active Contributor
0 Kudos

Hello

Please let me know below query

  1. Is both BOM have same Usage ?

  2. What value you have maintained in MRP4 field 'selection method'

3. Are you using Production version.

Try to maintain selection method  "With Selection by explosion date," and try.

Regards,

Velmurugan S

Former Member
0 Kudos

Hi Sir Thank you

1 Yes bom same usage

2  In MRP4 view Selection method is blank not given any value

3  No

former_member189817
Active Contributor
0 Kudos

Hello

Have tried with selection method  in MRP 4 as 2 ( "With Selection by explosion date,")

Regards,

Velmurugan S

former_member185453
Active Participant
0 Kudos

Hi Karthik,

Please elaborate more, what actually you want to do so that any one can give you some solution.

If you do not describe your problem in detail how you will get the solution.

Regards

S Ahmed

former_member189817
Active Contributor
0 Kudos

This message was moderated.