Business Requirements

80 % of A and B class direct materials are procured from contracted Suppliers. Buyers are well known about the contracts and manually convert the purchase requisitions into Purchase orders.

There is a scope to reduce the internal procurement lead time by removing manual touch points in procurement of such contracted Items like

  1. Automatic source assignment
  2. Batch job to convert the purchase Requisition into Purchase Order
  3. No release strategy required for such purchase order
  4. Minimum 4-5 line items should be added to single Purchase order
  5. Purchase orders should be communicated to supplier via e-mails

Management want to reduce the purchasing administration cost and want to be competitive in the market

Further want to bring the maverick purchases under control by reducing human mistakes

Current Process flow

  1. Purchase requisitions are generated via MRP
  2. Buyer assign the Source of Supply Manually
  3. Convert the purchase Requisition into Purchase order
  4. Release the purchase order
  5. Manually checks for rates and conditions (if required)
  6. Print out of purchase order and communicate to supplier
  7. Monitoring of PO delivery
  8. Good receipt with reference to purchase order
  9. Supplier invoice verification with 3-way match

Business Challenges /Pain Areas

  1. Internal procurement lead time is high
  2. Maverick purchases are beyond control because of manual touch points
  3. Administration cost is high as most of the purchase order are reviewed before sending to suppliers

Business Volume

1.36 Corers INR of annual of A& B class materials are procured by using contracts

2.Today’s internal procurement lead time is range from 3 to 5 days

3.Monthly @ 4000 Purchase orders are created for such materials

4. All these materials are procured from 6 key suppliers

5.Number of contracted items #16000

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Oct 21, 2015 at 01:03 PM

    HI Kuldeep,

    Some setting you should consider doing

    1. Maintenance of source list. This is a must for Auto PO generation.

    2. For Auto PO generation, make sure material master is updated along with the VM for Auto PO check box.

    3. Once you have done, you can set a batch job say nightly for converting PR to PO.

    4. For email transmission, make sure conditions are set up; medium should be '5 External send'.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 21, 2015 at 11:08 PM

    to make it short: MRP cannot create purchase orders.

    The prerequisites for auto PO are well documented, you only need to do those settings and then schedule the job for auto PO creation right after the MRP run

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.