Skip to Content
avatar image
Former Member

REM backflusing: Control key 0001 is not defined (check entry) Message no. CO755.

Operational activities are picked up during Cost calculation in product cost cost collector (KKF6N), but the same is not picked up during standard cost estimation(CK11N/CK40N), hence we are not able to do Back flush using MF42N transaction code, system also showing an error

Control key 0001 is not defined (check entry)

Message no. CO755.

We dont have '0001 control key used in Work center/ Rate routing, we used PP01 control key. Not sure where from this error coming. we referred many threads, still not able to clear this issue.

Please advice.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Feb 03, 2017 at 12:23 PM

    Hi Experts,

    Still we are not able to find out the reason where from system is finding missing control key '0001'

    Please advice us

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 15, 2017 at 06:28 AM

    Hi Experts

    It has been observed that system is considering from lot size as zero '0' during standard cost estimation but in our Rate routing from lot size defaulted as 1 by us for some of the products, hence for few materials standard cost estimation is carried out without any issue since those rate routing lot sizes are started from zero '0'.

    Corrective action: we made 'from lot sizes' zero '0' in rate routing for all manufacturing products, there on wards, system is considering all the operations and activities from rate routing during standard cost estimation, thus helped resolve the issue. We can close this thread.

    Thanks to all for your patience and the support

    Add comment
    10|10000 characters needed characters exceeded