on 10-20-2015 2:19 PM
Hello,
I have a question about an issue regarding cost calculation using a costing variant with transfer control.
When we execute CK11N for a material code all components in BOM of this material code are picked, but in BOM there are components valid from a future date respect of costing date in cost calculation, so system should not take in consideration them.
Is it right?
I noticed that for costing variant with transfer control these components are taken in consideration even if their BOM is valid for the future, they are in BOM of material father but from validity date in the future.
Example if I run CK11N for material code for 2015, I expect that compononts in BOM valid from 2016 don't taken in consideration, but using costing variant with transfer control they do!
While if I run CK11N for the same material code using another costing variant (without transfer control) these components with BOM valid from 2016 are not!
Do you have any suggestion about this?
Many thanks
Regards
Giusy Castiglione
Hi,
this has to do with costing date and quantity structure date.
CK11N processes the structure explosion as follows:
Please check top-down in the costing structure which cost estimates have been transferred and which have been created. This should clarify the reason why the 'future components' are included.
Regards,
Johannes
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.