Skip to Content

How to plan non-valuated materials in APO?

Dear experts,

We are facing CIF issues while transferring purchase requisitions (from APO to R/3) for non-valuated materials(UNBW).


This is the error:

Account assignment mandatory for material xxxxxxx (enter acc. ass. cat.)

Please suggest how to remove this error. Or is it even advisable to plan non-valuated materials in APO.

Many Thanks,

Best regards,

Bhuvan Paliwal

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2015 at 03:18 PM

    Hi Bhuvan,

    This looks like an error due to missing configurations in ECC-side from Purchasing/MM perspective.

    Please get all the required configuration in place first needed for Pur Rqs. creation in ECC first.

    You could start with OME9 in ECC & check the config for the relevant Account Assignment Category which is linked to the product you mentioned & ensure that all fields are properly set up.

    You could compare the settings between a GOOD product & a BAD product to arrive at the missing settings.

    Let me know if it works.

    Thanks

    Sooraj


    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.