Skip to Content
0
Former Member
Oct 20, 2015 at 06:47 AM

BW QA System Refresh

25 Views

Dear All

I would like to refresh my BW QA System with the latest BW PRD System.

Basically I want the same data of the production to be in QA system.

My challenging is to do copy and attach method from PRD to QA (copying the DB files: *.ndf and *.ldf).

But my QA is configured with different DB Name and different schema name.

Can somebody guide me with step by step procedure to do the copy and attach method from BW PRD to BW QA.

System Details:

Production System

DB Name: B12

Schema Name:B12


QA System:

DB Name: B11

schema name:B11



Thanks in Advance

Sel