Skip to Content
author's profile photo Former Member
Former Member

WM Movement type field selection

Can anybody knows if there is any field selection for wm movement type. I want to update automatic TO for the TR created with WM movement type 319. I know if I do change in configuration I can update A in automatic TO. But after doing some activity in TR example changing TR qty then only I want to update A there. Kindly confirm if it is possible.

Thanks,

Kiran

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Oct 19, 2015 at 10:25 AM

    Hi,

    In standard, movement type 319 is for production replenishment. Once the TR is created to stage the components in the order, you can automatically create the TO for this by activating auto TO in the definition of WM movement type 319. It will only work if you set up background job for program RLTAUT10.

    What exactly is the requirement here? The material quantities in the staging TR are indirectly copied from the production order, so why do you want to change those?

    Can you please sepcify the exact requirement here so that we can explore possible solutions.

    -Sushant

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.